The cul de sac with no houses on it yet. Ours is the basement in the back right corner.
Our Basement
Our Address
Before the basement floor was poured in the neighbor's basement.
Window Well
Basement Bathroom Plumbing
Window Wells
Our Basement (Angie and a realtor in the background)
Our house being moved in
The front of our house
Guys hard at work moving our house
Backing it into position
Site prepared to slide the house on
Lining everything up
Nudging it into place
Our unfinished garage
Kitchen
Guest Bathroom
Front Bedroom (Office)
Front Window
Stairs (Future Location)
Master Bedroom
Master Bathroom
Master Shower
Dining Room
Side of Garage
Back of Garage
Back of House
Side of House
Front of House
Sold!
House from Street
Stairs
Floor Plan
Living Room (with Furniture!)
Living Room, Dining Room, and Kitchen
Our New King Size Bed
Office
Painting the Garage Floor
Sprinkling Paint Chips
Finished Garage Floor
Garage Floor Detail
Starting Work on the Basement Bedroom
Materials to Start Finishing the Basement
Cutting the First Board
Nailing the First Board into Place
Framing Our First Wall
Working Around the Plumbing
Angie Cutting a Board
Doing Something With a Hammer
The Bedroom is Framed (except for the closet)
The Back Yard After a Big Snow
Closet with insulation
Window and lights
Wiring closet and bedroom
Angie cutting insulation
Angie measuring insulation
Angie and more insulation :)
Bedroom with insulation (left side)
Bedroom with insulation (right side)
Bedroom with insulation
Closet with drywall
Left wall with drywall
Spraying on the texture
More spraying
Close up of the spraying
Do you see Roger?
There he is!
Angie priming the corners
Wall with primer
Josh rolling on primer
Josh still rolling on primer
Walls painted with ceiling in progress
Josh putting in the last tile
Wall with lights
Closet
Finished ceiling
Laying the first few carpet tiles
Nudging carpet tile into place
Most of the carpet tiles down
New Sconce
Window wall
Closet wall
Bed wall
Josh painting Carter's room
Angie painting in Carter's room
Starting the planter
Josh working on the planter...that's Angie's supervisor chair
Finished block work
Ready for plants
existing shrubs
planting new shrubs
planting flowers
finishing touches
finished planter
Carter's room - window wall
Carter's room - dresser wall
Carter's room - another view of dresser wall
Carter's crib
Carter's closet
Our tree (I've added a few more balls since this was taken)
Our tree (no flash)
New shed from the front
New shed from the back
Inside of new shed
Angie breaking ground on the deck project
Josh drilling holes in the existing footings
State of the project after the first day (plus a little drilling and digging the night before)
Closer view after day 1
The beams and outer edges of the octagon with a few joists. (Couldn't do as much today because it rained all morning.)
The octagon with the rest of the joists.
Part of the decking. We had to stop because the rest of the decking they delivered was the wrong size!
Close up of the herringbone design
Front flower bed...looking good!
I can't even remember what these are called but I like the color.
White lantana
Rose shrub
Multi-color lantana
More of the multi-color lantana
Most of the octagon decking on but not trimmed
Most of the main decking on but not trimmed
Decking complete!
This is what it will look like all the way around.
The left side is complete, the right side still needs balusters. This step takes a while because there are a lot of cuts to make. Notice how the bottom of the posts are cut at an angle to match the bottom part of the balusters (see next pic).
Balusters
The deck is much closer to being finished!
The balusters still need to be added to the stairs on this side.
The octagon with railings and tiki torches. A table will eventually go here.
The main part of the deck. A grill will probably go on that side.