The steel works begins with the bow section.
Side on view of bow section
The galley wiring is complete so the cabinet work can installed.
Rear showing the semi trad stern
Under going striping after the main paintwork is finished.
The beginnings of a kitchen bench with taps for washing machine under
Galley starts to take effect, shows space for wall oven and cupboard over
The completed steel work has now been moved to the fit out shop.
The weed hatch over the propeller
Stern doors looking into the bedroom. The cupboard is for the electrical bits.
Line out has been completed & the cabinets are being installed.
The heart of the beast. An Isuzu 38hp 4 cylinder diesel. Only one alternator at present.
The saloon almost finished with port hole & window inserts waiting to be fitted.That's the dinette table upside down on the saloon table.
Before the fit out starts the hull is sprayed with foam insulation. Thats the white stuff on the wall.
A completed porthole.
Bulkheads are in & the dinette starts to take shape.
Bedroom showing the wardrobe & bed side cabinet.
Bed base & bedside cabinet.