This is a much shallower foundation for the grill island, still rebar reinforced.
Dumping in the final concrete
The part to the left will be counter/buffet/seating space, with small fridge on the inside. Toward the top of the picture will be a straight section with the grill and to the right (it will be angled, not curved really) will be two side burners and more counter/prep space.
How it looks 12 noon on Saturday, they took a break for lunch.
the gaps in the patio stone are going to be filled in with "decomposed granite" The grill and burners aren't yet hooked up to the gas line.
with the cover on the grill. Still waiting on the floor to be finished.