Bill Severns container - paint only with 3D effect. MLS 2009-0815
Monterey and our truck with container being prepared for false front - no holes put into the container. Posts into concrete here. MLS 2009-0815
Bill Severns container - all done with paint in a 3D effect. Door open on our container. MLS 2009-0815
Turn table pit being set up for concrete pour. Before ring rail. MLS 2009-0815
Pit for turntable before ring rail. MLS 2009-0815
Turntable pit before ring rail, which sits on the square pads. MLS 2009-0815
Perry McCully cutting ring rail while Cliff Faught and Bill Lowe talk and Jim Ascraft drives up. MLS 2009-0815
Dewey Mills, Cliff Faught, Bill Lowe, Jim Ascraft (golf cart). and Perry McCully cutting non-circular ends off the ring rail. MLS 2009-0815
Monterey in front of container with siding being added next to our container with doors open. MLS 2009-0815
Narrow gauge rack on left with three levels, top one at 6 ft. Standard gauge rack on right, top still at 6 ft. Equipment on top right rack will not fit on middle rack, too high. MLS 2009-0815
My loco running to charge battery, started right up after 5 months without running. MLS 2009-0815
Our container - Mejac Stables. Container is on the road with no room for walk way or overhang. Sliding stable door goes in the opening. Not attached to the container, ie no holes in the container. MLS 2009-0815
Grimes Coal Co. Mirrors in windows and you can see me taking this picture. MLS 2009-0815
Betty Jame Moore. Partial walk way and no cover. Ramp to the ground. MLS 2009-0815
Plywood front with door between two containers. Walkway with no cover on this side, but do have cover and walkway on the left side. Two containers covered with door to area between the containers. Ready for paint. MLS 2009-0815
Plywood is complete, waiting on paint. Walkway with no cover. Door goes to opening between two containers. MLS 2009-0815
One of the first rows of containers. MLS 2009-0815
Two containers with fake door between two containers. No door in operning to cover end of right container. No cover over the walk way. Fake stone on left. MLS 2009-0815
Mirrors in door and window. Cover over the walkway. Air vent on top of the container. MLS 2009-0815
Clock shop with walkway and cover. Door to space between containers as walk through. Vent on top of the container. MLS 2009-0815
Covered walkway. Door to area between containers. Fake window. MLS 2009-0815
Part of the first row of containers. MLS 2009-0815
Part of the first row of containers at MLS. MLS 2009-0815
Painted wood, cover not tin, double doors to area between containers, seating on covered walkway. MLS 2009-0815
Far Flung, siding just before crossing inbound Bobburg near underpass. MLS 2009-0815
Far Flung branch with near track going to Bobburg branch inbound. Two ballasted industry spurs. Non-ballasted main lines need signal wires prior to ballast. MLS 2009-0815
Interconnection Far Flung to Bobburg closest, then two main line tracks with left hand running, then two industrial spurs already ballasted. MLS 2009-0815
Far Flung at right with interconnect to Bobburg track closest, then two mains awaiting wiring for signals, then two industrial tracks. MLS 2009-0815
Far Flung outbound to Bobburg inbound innerconnect track at right. Bobburg at rear. MLS 2009-0815
Far Flung outbound to Bobburg inbound uses the curved track to interconnect the branches. MLS 2009-0815
Left hanf running on this passing siding so outbound Far Flung can take track on the right to Bobburg inbound. MLS 2009-0815
Jim Zimmerman showing us the Far Flung passing siding (foreground two tracks going into one) with no ballast, waiting on signal wire installation. The industry spur is ballasted since it needs no signal wires. MLS 2009-0815
Jim Zimmerman showing Monterey and Rick the latest on the Far Flung branch. MLS 2009-0815
The Far Flung siding ends at right foreground and continues across the Bobburg and down under the Bobburg outbound. MLS 2009-0815
Left track takes Far Flung inbound to Bobburg inbound. Industry spur is closest track, no ballast. The Bobburg inbound main is ballasted and hardly shows up between these other two tracks. MLS 2009-0815
Ballast track is Bobburg inbound (looking outbound) with Far Flung inbound to Bobburg inbound interconnect track at the left. Industry track at right. MLS 2009-0815
Ballasted Bobburg inbound track with no ballast track. MLS 2009-0815
Track in foreground is the interconnect from Far Flung (in view) to Bobburg inbound, behind the camera. MLS 2009-0815
Work train on Bobburg inbound main. Coming up on interconnect to Far Flung inbound at right, not ballasted. MLS 2009-0815
Work Train on inbound Bobburg. MLS 2009-0815
Bill Lowe and Dewey Mills about to ballast the interconnect track between Far Flung inbound and Bobburg inbound. MLS 2009-0815
Monterey talking to Jim Ashcraft. MLS 2009-0815
Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815
Monterey White and Jim Zimmerman looking at the Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815
Just rained and ground is wet under the Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815
Monterey White and Jim Zimmerman on the Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815
Abutment is concrete block with re-bar and concrete inside the holes. Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815
Monterey White on the the Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815 This bridge is about 30 ft long, would make a great Phase IV bridge and much simplier than some proposed.
Monterey White on the Double Track steel bridge made from 3 surplus pipe racks. MLS 2009-0815
Lock on container well protected from pry bars. MLS 2009-0815
Lock on container that is well protected from prybars. MLS 2009-0815
Turntable pit with the ring rail welded in place on top of the square tabs. MLS 2009-0815
Turntable pit with the ring rail now welded onto the square tabs. MLS 2009-0815
Ring rail was just welded onto the square tabs that fixed the height. MLS 2009-0815
Ring rail weled end to end at lower right and welded onto the square tabs that set the height. MLS 2009-0815
Center post and the turntable pit. MLS 2009-0815
Center post and how the plywood was used to hold the bolts into position while pouring the concrete. MLS 2009-0815
Center post showing that there are nuts top and bottom of the plywood pattern for the center post of the turntable. MLS 2009-0815
Steel bars hold the circle on the outside. Three re-bar into the ground hold the pattern around the pit. Square tab on a re-bar sets the ring rail height. MLS 2009-0815
Turntable pit and how it relates to the containers. Transfer table passes in front of the white container seen end on. Will be three tracks when done. MLS 2009-0815
Front covering three containers. Has overhang and walkway. False windows. Church like entryway. MLS 2009-0815
Cover over walkway. Two windows at left over container, next one in space between containers. Doorway over a container. MLS 2009-0815
Doorway over a container with adjacent windows in front of space between containers. MLS 2009-0815
Two windows at right over container. Walkway with cover. MLS 2009-0815
Bare container next to covered walkway in front of a container and the space to its right. MLS 2009-0815
General store has covered walkway. Door leads to space between containers. Blank wall in front of the container. MLS 2009-0815
Three container owners built an elevated sitting platform over the ends. Shaded walkway. Two bare container ends. One plywood end. MLS 2009-0815
Bare container, needs covering. MLS 2009-0815
Plywood only cover. MLS 2009-0815
Fire Marshall with 20 ft container false fronts on two sides. Covered walkway with seating. Door to side walkway. MLS 2009-0815
False front with walkway and no cover. MLS 2009-0815
Covered walkway with seating. Mirrors in windows in front of the Fire Marshall container. MLS 2009-0815
Bank has fake brick siding, covered walkway with seating. MLS 2009-0815
Bank with door leading to space between containers. Fake brick front with fake concrete pillars on corners. Covered walkway with seating. MLS 2009-0815
Left side of the Bank showing the fake brick siding and the fake concrete pillars leading to the doorway between containers. Covered walkway. MLS 2009-0815
Right side of the bank with covered walkway and seating. Fake brick and fake concrete pillars leading to the door. MLS 2009-0815
Next to the Bank is a Cafe. Wood front with covered walkway. MLS 2009-0815
Cafe with door leading to space between the containers. Window is fake. Covered walkway with seating for the Cafe. MLS 2009-0815
The Undertaker - the original MLS container. Next to picknic area. MLS 2009-0815
Undertaker wood board false front with fake window and door to space between containers. Covered walkway with seating. MLS 2009-0815
Grimes Coal has mirrors in the windows and door in front of the container. Right window over space between the containers. MLS 2009-0815
Mejac Stables. Road just two feet from container precludes walkway and overhang. Door will be covered with sliding door. May put in a metal door in the container to get a cross breeze. Will add battons and paint barn red. Windows left and right to be added. Hay loft to be simulated above the door. MLS 2009-0815
Plywood in the making. None of the wood you see in connected to the container, just to posts mounted on concrete. MLS 2009-0815
Plywood in the making beside road to transfer table. Posts into ground, not onto container. Want no holes in container. MLS 2009-0815
Bill Severns painted container side in a 3D effect. MLS 2009-0815
Betty Jane Moore. Partial walkway and no cover. Seating. Door is on the container, gate to left of red goes to walkway between containers. MLS 2009-0815
Plywood all ready for a design and for painting. Walkway with no cover. MLS 2009-0815
Slidding door over otherwise bare container. MLS 2009-0815
Two standard gauge tracks side by side on one half of a container. Three tracks high on 8 ft tall container. MLS 2009-0815
Fire Marshall with overhang, porch, and seating. Mirrors in windows. MLS 2009-0815
Weathered wood with concrete ornaments. Walkway with no cover. MLS 2009-0815
Cafe advertising Coffee, with table and chairs on porch under an overhang. MLS 2009-0815
Undertaker with overhang, porch, seating. MLS 2009-0815
Undertaker. MLS 2009-0815
Undertaker MLS 2009-0815
Two tracks wide and high with two grond tracks beside. 20 ft container. MLS 2009-0815
Rack that is two tracks wide and two high for standard gauge plus two ground level tracks. 20 ft container. MLS 2009-0815
No door yet on the Adobe City Pawn Shoppe. MLS 2009-0815
Sign. MLS 2009-0815
Fake rock wall. Walk way with no cover. MLS 2009-0815
Adobe Assay office with mirros in windows showing the photographer. Covered walkway. MLS 2009-0815
Mountain Time Clock Shop - overhang, walkway. MLS 2009-0815
Overhang, walkway, fake windows. Real doorway to path between containers. MLS 2009-0815
Overhang, walkeay, fake window, real doorway to path between containers. MLS 2009-0815
Overhang, walkway, chairs, cut out coyboys. MLS 2009-0815
Adobe Western work area with pass through doors for breeze. MLS 2009-0815
Container end with fake door and advertisements. Overhang, walkway, chairs. MLS 2009-0815
Overhang, seating, fenced area to right and walkway to left. MLS 2009-0815
Overhang, fake window, real door to container - breeze permitted, fenced area to left with walkway to right.
Stables with fenced area between containers on right, fake window in front of the container. MLS 2009-0815
Door to area between the containers. Wood cover over container end. Covered walkway. MLS 2009-0815
End of 40 ft containers on left has a covered walkway leading to fronts of the 20 ft containers. MLS 2009-0815
Hotel over ends of two containers with door leading to area between the containers. Overhang with walkway. Fake windows in front of the two containers. MLS 2009-0815
Dentist next to Hotel with open walk between the containers. Fake door and window on container end. Covered walkway. MLS 2009-0815
Guns and Ammo is just false front with door to area between two containers. Not in front of a container. MLS 2009-0815
Dentist office is just 8 ft wide with fake window and door. Covered walkway. MLS 2009-0815
Door cut into container end. Covered walkway. Door on right to area between the containers is blocked with the signs. Covered walkway on front and left side. MLS 2009-0815.
Signs tend to bring a laugh. MLS 2009-0815