Plumbing Work
K. helping clean up after the rough plumbing.
M. at work planning more of the basement.
Hanging Screen
Cleaning up after the rough electrical work.
Insulating
Insulating.
Panoramic Shot
After the wall insulation.
Wall insulation.
After the wall insulation (towards play area)
After the wall insulation (from play area).
After the wall insulation (closet in storage/bedroom).
After the wall insulation. (storage/bedroom)
Insulating bathroom.
Interior wall of storage/bedroom that still needs insulation.
Insulation progress, length of basement.
Screen is Operational
Screen
Screen Model
Screen Measurements for M
It goes up and down!
cold air return
speaker wires
screen down
drywall, oh my! Drywall Day #1
Drywall Day #1
Note: photo was taken 10/27/2003
The money shot!
Tile almost completely laid and ready for grout.
Tile almost done and ready for grout.
Mark's painting project
The trim after a black paint job.
projector mount
uncalibrated screen shot (with flash)
uncalibrated screen shot (w/o flash)
uncalibrated screen shot (Eagles)
Mark installing the last light fixture that had to be spray painted.
Underlayment for the flooring!
Mark installed the molding around the furnace room doorway. The bifolds are ready!
Mark installed the molding around the closet door.
Around closet door.
A bit of base board ready to be nailed.
Our basement computer, who decided to go 'kaput' over the weekend.
All 5 doors are stained, finished, and installed down this hallway (well, except for the bifolds)!
Octagonal post treatment.
And so the floor begins (bar area)
Moving the pool table.......carefully!
THE FLOOR AT 5PM TODAY
THE FLOOR AT 8:15PM TODAY
Pool Table is Moved!
Bar
Screen Down
Long view - from Theater
Hallway to storage and bathroom
Bathroom - Kendall named the toilet "The Penny Potty"
Playroom area....typical state of disarray
Other end of Playroom....Tower of markers/pencils on the table and Kendall's dancing mirror on left wall.
Storage Room....possible future bedroom
Storage Room - possible future bedroom